Pedestrians at risk on ORR as street lights go out

Street lights on a busy 10-km stretch of the Outer Ring Road from Whitefield to Bellandur haven’t been working for the past two weeks. Pedestrians struggle to walk on the footpath. And those who need to cross the road have to dodge speeding vehicles whose headlights are on high beam.

Seema Sharma, a resident of Bellandur, told The Hindu that the stretch from Graphite India Junction in Whitefield to her neighbourhood is completely dark. “It’s a huge security risk, both in terms of risk of accidents and women’s safety. Notably, the hoardings are well lit. In fact, along with lights from malls and shops, they are the only source of light on the stretch,” she says.

Another commuter P. Selvaraj said that since there are no street lights, most motorists are using headlights in high beam, decreasing visibility and posing a risk for commuters as well. “I had a tough time riding my bike on the stretch two days ago. The street lights on Marathahalli flyover are also not functioning,” he added.

Ms. Sharma complained to the Bruhat Bengaluru Mahanagara Palike (BBMP) almost a week ago only to be told that the problem may not be solved in the immediate future.

Ranganathan, executive engineer, Mahadevapura zone, said that the BBMP had called for a street light maintenance tender on ORR but it will be at least three weeks before they are set right.

It’s not just ORR that is facing this problem. Traffic cops have received complaints from the newly opened Doddanekkundi flyover as well.

“Lack of street lights and use of high beam lights are very dangerous for pedestrians and makes them all the more vulnerable,” said Abhishek Goyal, DCP (Traffic-East).

Advertisers and road cutting to blame?

Electrical wiring is often damaged by people who cut roads illegally. The other culprits are people who put up hoardings and neon light boards on medians.

The electric lines for street lights often stretch for a few kilometres. If the line is damaged, lights on the entire stretch will not get electricity.

“In the case of ORR, the wiring has been damaged by people who put hoardings on medians. They destroy the wiring while digging up the median. In some patches, the BWSSB has damaged wiring while cutting a road,” said Mr. Ranganathan.

Amaravathi and Thirumoorthy Dams See Rising Water Levels Following Continuous Inflow

Amaravathi Dam in Tiruppur district has reached 50.56 feet as of July 16, with an inflow of 219 cubic feet per second. T...

Water Levels Rise in Coimbatore District Dams Amid Monsoon Season

Three major dams in Coimbatore district report varying water levels as of July 16. Aliyar Dam stands at 56.2 feet with r...

Ganapathy Maanagar to Get New ₹97-Lakh Park; Corporation Commissioner Reviews Progress

Coimbatore Corporation Commissioner Katta Ravi Teja inspected the ongoing works of a new park at a cost of ₹97 lakh in G...

Construction Worker Held in Alleged Animal Sexual Abuse Case in Coimbatore

A 35-year-old construction worker from West Bengal has been arrested by the Kavundampalayam Police for allegedly sexuall...

Coimbatore Hosts AORA–GARC 2026, One of India’s Largest Anaesthesia Conferences

The 16th Annual National Conference of the Academy of Regional Anaesthesia of India (AORA) and the Ganga Anaesthesia Ref...

TNSTC Bus Driver Arrested Under POCSO Act in Coimbatore

Shankar (36), a Tamil Nadu State Transport Corporation (TNSTC) driver from Thondamuthur, has been arrested under the Pro...