Now, garbage dump in Varthur canal catches fire

After froth, an incident of fire was reported at Varthur lake after residents spotted a huge garbage dump near the inlet canal set ablaze on Tuesday morning.

The garbage pile was dumped in the feeder canal that connects Bellandur lake to Varthur, close to Thubarahalli. It is suspected that some miscreants set fire to the mound, which leads to thick smoke engulfing the area.

“This has become some sort of illegal waste processing site. Trucks dump garbage here, ragpickers sort it and leave leftovers in the canal. Owing to the rains, a heavy gush of water flows underneath the garbage,” said Jagadish Reddy from Varthur Rising, who spotted the fire on Tuesday morning.

It was these mounds of garbage that had been washed away into Varthur lake during the monsoons last year, covering the already putrid lake with a layer of trash. “The BBMP contractors have turned this spot into a dumping site, like Mandur. There is fair bit of recycling and upcycling happening here, but discarded waste is left in the canals. We have made numerous complaints, but there has been no action by BBMP,” said Elangovan Kulandaivelu, a member of Whitefield Rising and a resident of the area.

This is perhaps the first time that garbage on Varthur lake has caught fire. In February, a massive fire broke out at Bellandur lake, while on May 7, dry grass was allegedly set on fire by miscreants. In May, the National Green Tribunal had directed the civic authority to stop solid waste dumping around Bellandur lake, and were directed to control the flow of sewage into the lake.

Bruhat Bengaluru Mahanagara Palike (BBMP) Joint Commissioner (Health/SWM) Sarfaraz Khan said patrolling had been intensified around Bellandur and parts of Varthur. “Our officials have been on night patrol. We have to gather how this dumping took place,” he said.

Underneath the incredible volume of froth that spewed onto roads and commercial complexes near Varthur Kodi on Old Airport Road, were a series of pipes that formed the erstwhile ‘siphon’ system installed to suppress froth.

It was clear on Sunday that much of the system had been washed away. “The system was on trial and works only in dry weather. It was not designed for heavy rains,” said S.M. Ramakrishna, Chief Engineer (Waste Water Management), Bangalore Water Supply and Sewerage Board (BWSSB).

The system may be the last the city will see, for the board’s call for suggestions for more robust designs from institutions and researchers did not see any response. “We will look at more permanent options,” said the official.

There has, however, been the positive response for bioremediation, which will see setting up of 500-m wetlands along storm water drains that lead into Bellandur lakes. Of the three companies that came forward, one had been chosen, and officials said a final approval was pending before works could start.

DMK Will Continue to Fight for People’s Welfare as Opposition: CM M. K. Stalin

In a statement following the election results, DMK president M. K. Stalin said that the party, which had functioned as a...

Shocking Upset: MK Stalin Defeated in Kolathur by TVK’s VS Babu

In a major political upset in Tamil Nadu, Chief Minister M. K. Stalin has lost the Kolathur Assembly constituency to TVK...

Pollachi Round 1 Update: AIADMK Leads

In Round 1 of counting in Pollachi, AIADMK’s Pollachi Jayaraman leads with 3,724 votes, followed by DMK ally Nithyanatha...

South Constituency: Senthil Balaji Leads After Round 1; TVK Close Behind

After Round 1 of counting at the GCT centre in Coimbatore, DMK’s Senthil Balaji leads with 3,481 votes, followed closely...

EC Releases Data: Women Voters Lead in Tamil Nadu as Turnout Reaches 4.88 Crore

According to ECI’s official figures, a total of 4,87,98,833 voters cast their votes out of an electorate of around 5.73...

Water Levels Rise in Major Dams Across Coimbatore and Tiruppur Districts Following Rainfall

Water levels have increased in five major dams across Coimbatore and Tiruppur districts as of May 3, due to continuous i...