Thirumoorthy Dam Water Release Plan Discussed for Second Zone Irrigation

A meeting of the Thirumoorthy Reservoir Project Committee was held on August 6, 2024, to discuss water release from Thirumoorthy Dam for second zone irrigation in Parambikulam Aliyar Project areas.


Coimbatore: A crucial meeting of the Thirumoorthy Reservoir Project Committee was held on August 6, 2024, at the office of the Superintending Engineer, PAP, in Pollachi. The meeting focused on the release of water from Thirumoorthy Dam for second zone irrigation in the Parambikulam Aliyar Project (PAP) areas.

The committee meeting was chaired by Dr. Paramasivam, the Project Committee Chairman. S. Murugesan, B.E., Superintending Engineer, WRD (PWD), was also present at the meeting.

Committee members P. Arun, C. Nithyanandam, K. Nallathambi, Ko. Kurusamy, P. Easwaran, M. Deivasigamani, M. Easwara Moorthy, and R. Balasubramanian attended the meeting. Additionally, executive engineers from the Water Resources Department, Aliyar Basin Division, Pollachi, and Thirumoorthy Division, Udumalpet, participated in the discussions.

The committee considered the current water levels in the Parambikulam Aliyar Project reservoir system and the expected inflow due to the Southwest monsoon. Noting that all reservoirs except Thirumoorthy Dam have reached their full capacity, the committee decided on the following water release plan:

1. Water release for the second zone irrigation will commence from August 19, 2024.

2. The release will be spread over 120 days, with four rounds of water supply at appropriate intervals.

3. If the PAP reservoir system receives higher inflow and maintains good storage during the irrigation period, an additional round of water supply may be provided.

4. A similar plan of 4+1 rounds of water supply was also approved for the upcoming third zone irrigation.

This decision aims to ensure efficient water management and equitable distribution for agricultural needs in the region, taking into account the current water levels and expected monsoon patterns.

Sulur Minor Girl Murder: Aunt Alleges Body Was Cremated Without Mother’s Consent

Fresh controversy has emerged in the Sulur minor girl sexual assault and murder case after a relative alleged that the g...

Coimbatore Girl Murder Case: Eeranenjam Shelter Home Elders Hold Candlelight Vigil Seeking Justice

Elderly residents of Eeranenjam shelter home in Coimbatore held a tearful candlelight vigil demanding justice for the 10...

Solayar Dam Water Level Stands at 21.39 Feet with Steady Inflow

Solayar Dam in Valparai recorded a water level of 21.39 feet as of May 24, with an inflow of 113 cubic feet per second d...

Parambikulam Dam Water Level Rises to 27.05 Feet Following Southwest Monsoon Rainfall

Parambikulam Dam near Pollachi has recorded a water level of 27.05 feet as of August 24, with continuous inflow of 45 cu...

Azhiyar Dam Water Level Stands at 64.7 Feet with Steady Inflow Following Rainfall

Azhiyar Dam near Anaimalai records water level at 64.7 feet against 120 feet capacity. Inflow stands at 320 cusecs while...

Chief Minister's Talent Search Exam Winners Visit Semmozhipoonkavai in Coimbatore

As part of the summer camp for Chief Minister's Talent Search Exam winners organized by the School Education Department...