Changes in Traffic Due to Approach Road Works of Noyyal River Flyover in Coimbatore

Due to the ongoing approach road works at the Noyyal River Flyover on Singanallur-Vellalore Road, traffic changes have been implemented in various parts of Coimbatore district, as announced by city police.


Coimbatore: Certainly! Here’s a more detailed translation of the news:

In Coimbatore, due to the ongoing construction work on the approach road of the Noyyal River Flyover, traffic diversions have been implemented in various parts of the city. The city police have notified the public about these changes to facilitate smoother traffic flow during the construction period.

For lightweight vehicles and motorcycles traveling from Singanallur to Vellalore, they are advised to go via Singanallur, Trichy Road, Shanthi Gears Junction, Ondipudur Junction, through Nesavalar Colony, to the town and then reach Vellalore by passing the Noyyal Bridge and L&T Bypass.

For heavy vehicles traveling from Singanallur to Vellalore, the designated route is from Singanallur through Trichy Road, Shanthi Gears, Ondipudur, Kaamaatchipuram Checkpost, private school junction, then taking a U-turn to reach Coimbatore road, followed by L&T Bypass, Palakkad Road, and Kangayam Palayam to Vellalore.

Lightweight vehicles traveling from Vellalore to Singanallur are advised to take a return from Vellalore Indian Oil petrol bunk, reach Pattanam Road, and go through L&T outer ring road, Nesavalar Colony, and finally reach Singanallur via the left side of Noyyal Bridge and Ondipudur Junction.

For heavy vehicles traveling from Vellalore to Singanallur, the diversion is from Vellalore Indian Oil, taking a return on the right, then moving through L.G. Nagar, reaching L&T outer ring road, Nesavalar Colony, passing through the left of Noyyal Bridge, and finally, through Ondipudur Junction to reach Singanallur.

These temporary traffic diversions are aimed at ensuring that the construction work on the approach roads of the Noyyal River Flyover progresses smoothly and that traffic congestion in the city is minimized during this period.

Siruvani Dam Leakage Repair Estimated at ₹18 Crore: Commissioner Kattaravi Teja Conducts Inspection

Coimbatore Corporation Commissioner Kattaravi Teja personally inspected the water leakage at Siruvani Dam in Kerala. Rep...

Two Killed, Three Injured in Separate Road Accidents Across Coimbatore

A 60-year-old woman and a 24-year-old motorcyclist were killed in separate road accidents in Coimbatore, while three oth...

400 Police Personnel, 20 Locations: Coimbatore Anti-Drug Drive Seizes Variety of Drugs, 10 Arrested

More than 400 police personnel conducted simultaneous raids across over 20 locations in Coimbatore, leading to the seizu...

Tourist Alert: Kovai Kutralam Waterfalls Closed Until Further Notice Due to Flash Flooding

The Forest Department has closed the Kovai Kutralam Eco Tourism Centre until further notice following heavy rainfall and...

Rail Passengers Alert: Southern Railway Announces Delays for Two Express Trains in Salem Division

Sleeper renewal works between Magudanchavadi and Virapandy Road railway stations in the Erode–Salem section will delay t...

Cooler Week Ahead as Clouds and Showers Dominate Coimbatore

Coimbatore is expected to witness a cooler-than-usual first week of July with daytime temperatures between 30°C and 32°C...