Major Encroachment Removal Operation Causes Stir on Udumalpet Bypass Road

In a significant move to clear encroachments, the Udumalpet Highway Department conducted an operation on the Udumalpet-Chinnar road, causing temporary traffic congestion. The operation targeted extensions such as canopies and billboards extending in front of shops from Ariyabhavan signal to Lourde Matha School and other key areas, emphasizing the commitment to ensuring unobstructed traffic flow on both sides of the road.


Udumalpet, February 23 - A significant operation to remove encroachments along the main Udumalpet Bypass Road in Tirupur district stirred the local community. The action, undertaken by the Udumalpet Highway Department, focused on clearing obstructions from Ariyabhavan signal to Podipatti Annanagar Lourde Matha School, and other critical stretches including Rajendra Road and Tharapuram Road.

This operation was conducted in the presence of Udumalpet Urban Planning Officer Udayakumar, along with officials from the Highway Department, Survey Department, and Traffic Police. Encroachments, including extended canopies and advertising banners in front of shops, were dismantled using JCB machines. This led to temporary traffic congestion on the bypass road but was a crucial step toward improving traffic flow and safety.

The move comes after a resolution was passed in the town council to construct a new road, addressing long-standing demands from the public for a safer and smoother commute. The operation signifies a broader effort to ensure roads on both sides are free from obstructions that hinder traffic, with a stern warning issued against future encroachments.

The initiative has brought attention to the need for maintaining clear pathways for traffic and is part of a larger drive to enhance urban infrastructure in the Udumalpet area. Authorities have warned of strict actions against any future attempts to encroach upon the road, ensuring the safety and convenience of the commuting public.

Solayar Dam Water Level Stands at 21.39 Feet with Steady Inflow

Solayar Dam in Valparai recorded a water level of 21.39 feet as of May 24, with an inflow of 113 cubic feet per second d...

Parambikulam Dam Water Level Rises to 27.05 Feet Following Southwest Monsoon Rainfall

Parambikulam Dam near Pollachi has recorded a water level of 27.05 feet as of August 24, with continuous inflow of 45 cu...

Azhiyar Dam Water Level Stands at 64.7 Feet with Steady Inflow Following Rainfall

Azhiyar Dam near Anaimalai records water level at 64.7 feet against 120 feet capacity. Inflow stands at 320 cusecs while...

Chief Minister's Talent Search Exam Winners Visit Semmozhipoonkavai in Coimbatore

As part of the summer camp for Chief Minister's Talent Search Exam winners organized by the School Education Department...

MLA SP Velumani Demands ₹1 Crore Aid After 10-Year-Old's Sexual Assault and Murder in Sulur

A 10-year-old girl from Sulur, Pallapalayam, Bharathipuram area in Coimbatore district was abducted on a two-wheeler on...

Corporation Commissioner Inspects Amma Unavagams as Part of Quality Assessment Drive

Coimbatore Corporation Commissioner M Sivaguru Prabakaran inspected Amma Unavagams across the city to upgrade infrastruc...