PM Modi to inaugurate Multi-Modal Terminal in Varanasi next week

Prime Minister Narendra Modi will inaugurate a Multi-Modal Terminal on River Ganga in Varanasi on Monday. Modi will also receive the first consignment of containers moving on the Ganga from Kolkata to Varanasi on November 12 as India revives its inland waterways for freight movement.

Prime Minister Narendra Modi will inaugurate a Multi-Modal Terminal on River Ganga in Varanasi on Monday. Modi will also receive the first consignment of containers moving on the Ganga from Kolkata to Varanasi on November 12 as India revives its inland waterways for freight movement.

The Multi-Modal Terminal in Varanasi is the first of three Multi-Modal Terminals being constructed on River Ganga. Started in June 2016, the terminal is built on an area of 33.34 hectares and costs Rs 206.84 crore. The total capacity of the terminal is 1.26 MPTA.

A total of three Multi-Modal Terminals and two Inter-modal Terminals are being constructed on the river as part of the central government’s Jal Marg Vikas project. The Rs 5,369-crore project aims to promote inland waterways for cheaper and environment-friendly conveyance, especially for the transportation of cargos. It thus plans to develop the stretch of Ganga between Varanasi and Haldia for navigation of large vessels of up to 1,500-2,000 tonnes by setting up of required systems there.

Also read | PM Narendra Modi to receive first lot of containers moving on National Waterways-1

Being implemented by Inland Waterways Authority of India (IWAI), the Jal Marg Vikas project is technically supported by World Bank. The total estimated project cost of Rs 5,369.18 crore is also being equally shared between the World Bank and the Government of India.

The project entails construction of three Multi-Modal Terminals at Varanasi, Sahibganj and Haldia, two inter-modal terminals, five roll-on – roll-off (Ro-Ro) terminal pairs, new navigation lock at Farakka, assured depth dredging, integrated vessel repair and maintenance facility, differential global positioning system (DGPS), river information system (RIS), river training and river conservancy works.

The operation, management and further development of the MMTs are proposed to be consigned to an operator on Public-private partnership (PPP) model, whose selection would occur through an international competitive bidding, which is expected to be completed by the end of the year.

The MMT project and proposed freight village in Varanasi are expected to generate 500 direct employment and more than 2000 indirect employment opportunities.

India has about 14,500 km of navigable waterways which include rivers, canals, backwaters, creeks among others.

Newsletter

Prime Minister Modi inaugurates Atal Tunnel - longest tunnel above 10000 ft

Ladakh: The Prime Minister today inaugurated the Atal Tunnel and took the inaugural drive through in the 9km long tunnel...

Orissa High Court Order regarding migrant workers entry into Orissa put on hold by the Supreme Court

The Orissa High Court order to permit the entry of migrant workers only if they tested Negative for COVID-19 was put on...

Coronavirus Lockdown - First Flights To Bring Back Indians Stranded Abroad Land In Kerala

On Monday, the central government announced plans to begin a massive repatriation of its citizens stranded abroad, dubbe...

Reacting to Trump's retaliation threat India allows Hydroxychloroquine export

In a move after Trump's threat to retaliate if India fails to send medicines, India has lifted ban of export of ess...

All Domestic Passenger Flights Suspended from Midnight Tomorrow

The operations of all domestic schedule commercial airlines will stop operations from 23.59pm on March 24, a government...

Iran says it ‘unintentionally’ shot down Ukrainian plane, blames ‘human error’

Iran had denied for several days that a missile downed the aircraft. But then the US and Canada, citing intelligence, sa...