Areas to be affected by Power shutdown on 24.01.2019
The Tamil Nadu Electricity Board (TNEB), Coimbatore has announced for a total shutdown at Seeranaickenpalayam, Madhampatty, Devarayapuram, Thondamuthur Substations on 24.01.2019 (Thursday) from 9 a.m. to 4 p.m.
The shutdown will be due to monthly maintenance works in the power transformer. A power supply will not be available in the following places:
Seeranaickenpalayam
1.Seeranaickenpalayam
2.PN Pudur
3.Vadavalli
4.Vedapatty
5.Veerakeralam
6.Telungupalayam
7.Velandipalayam
8.Saibaba Colony
9.Sundapalyam(Partly)
10.Selvapuram
Madhampatty
1.Madhampatty
2.Alandurai
3.Kuppanur
4.Karadimadai
5.Poondy
6.Semmedu
7.Theethipalayam
8.Perur
9.Goundanur
10.Kalampalayam
11.Perurchettipalayam
Devarayapuram
1.Devarayapuram
2.Boluvampatty
3.Viraliyur
4.Narasipuram
5.J.N.Palayam
6.Kaliannanpudur
7.Puthur
8.Thennamanallur
9.Kondayampalayam
10.Thendral Nagar
Thondamuthur
1.Thondamuthur
2.Kembanur
3.Muthipalayam
4.Kalikkanaickenpalayam
5.Poochiyur
6.Puthupalayam
7.Dheenampalayam
8.Uliyampalayam
9.Dhaliyur
10.Kulathupalayam
11.West Chithirai Chavady